Thanks to the use of backup power sources, even during blackouts, construction work did not stop, which allowed the active construction of the Millennium State and Idilika Avenue residential complexes to continue.
This year was also significant for the company, as a new ambitious project was launched - the Millennium Park residential complex.
The Millennium Park complex will consist of nine-story buildings with individual gas heating, with a cozy alley for walks, commerce on the territory of the residential complex, sports and children's playgrounds, and its own parking lot. The entire territory of the complex will be under video surveillance 24/7. The main highlight of the complex is a 5-hectare square, which begins immediately outside the residential complex.
Millennium State residential complex
Section 4A
- 60% of keys issued;
Section 4B
- All 11 floors have been built;
- Construction of technical premises on the roof is being completed;
- Facade work on section insulation and waterproofing continues;
- Glazing of the section is completed;
- Interior partitions are being installed;
- We are working on laying the water supply in the basement;
- Distribution of electricity supply to apartments has been completed;
- The installation of drain pipes has been completed, which is an important step in creating a convenient drainage system;
- Pouring of the screed on the cold transitions has begun to ensure even and strong coatings.
Section 4B
The construction of the 6th floor has been completed and the construction of the 7th floor has begun.
Courtyard
- A security post and video surveillance have been activated on the territory of the complex. It is located in section 4G to ensure the highest level of security for all residents;
- A fountain has been installed and launched, which will be a wonderful addition to the home territory and will create an atmosphere of beauty and harmony;
- Mounted multipole for sports leisure of residents of the residential complex;
- Installation of benches on the recreation area has been completed, creating an area for recreation and communication;
- Planted thuja trees that will add coziness and beauty to your future home.
Residential complex Idilika Avenue
Section 1
- The laying of all 9 floors has been successfully completed, the building has a completely finished look;
- Facade works and glazing from the inside of the section;
- Glazing and commercial premises are completely done;
- The main gas main has been laid and the laying of the gas supply network has begun;
- Work has begun on laying power cables, switching electric meter panels and connecting communications;
- From the 9th to the 5th floor, the water supply system has already been installed in the apartments and meters have been installed for accounting for cold water;
- Decorative plaster was applied to the floors in common areas, and it was also painted;
- On the floors, they finished laying tiles on the floor;
- The leveling of the territory near the house has begun.
Section 2
- The laying of all 9 floors has been successfully completed, the building has a completely finished look;
- Facade works and glazing from the inside of the section;
- The staircase was prepared for applying decorative plaster;
- Pouring screed and plastering work in apartments has started;
- Glazing of commercial premises is completely done;
- Facade works of commercial premises continue;
- The laying of tiles on the floors has begun;
- Work has begun on laying power cables, switching electric meter panels and connecting communications;
- The leveling of the territory near the house has begun.
The entrance doors for the apartments have been delivered.
Section 1
The process of building the machine room of the elevator is in full swing. This stage is important to ensure the smooth operation of the elevator in the future.
The pouring of the monolith in the entrance groups and on the floors continues to give them reliability and strength.
Plastering has already been done on four floors at once, namely from the 9th to the 5th, giving the premises a clean and updated look.
Applying decorative plaster on the staircase
- Painting of MZK on the floors;
- Applying decorative plaster and painting it on the staircase;
Millennium Park residential complex
Section 1 and Section 2
- A pit was dug for the construction of the 1st and 2nd sections of the building;
- Pouring of sub-concrete;
- Filling the foundation pillow;
- Installation of foundation blocks;
- Construction of basements;
- External waterproofing of basement walls.