Section 4A
- completed plastering work in all apartments and on 11 floors;
- completed work on the construction of internal walls up to the 11th floor;
- chimney installation completed.
Section 4B
- the overlap of the third floor is completed;
- preparation for the construction of the walls of the fourth floor.
Section 4B
- foundation work is in progress;
- installation of foundation blocks of the foundation.
Section 4G
- installed radiators on 8 floors;
- a laser floor screed up to the 8th floor was made;
- underfloor heating system laid up to the 8th floor.
Sections 4D and 3D
- Gas was started in.
The adjacent
- area is tiled near Section 4B;
- a fence was installed around the sports ground.