In section A
- preparatory work for the installation of gas pipes
- begins work on the interior decoration of the entrances
- completion door installation
In Section G
- preparatory work for the installation of gas pipes is completed
In Section D
- masonry begins on the 6th floor
In Section 4D
- brickwork on the 6th floor is completed
In Section 4A
- the piling foundation