New photo report on the state of construction of the Millennium State on November.
In section A
- plastering walls on 10-11 floors
- pouring floor screed on 10 -11 floors
- installation of doors
In Section G
- the corridors are being finished
In Section D
- brickwork on 4 floor
In Section 4D
- brickwork on 5 floor
In the yard, paving tiles are being laid.