We bring to your attention a new photo report on the state of construction of the Millennium State for August 2019
In section a
- brickwork of parapets;
- plastering work on floors 7-8;
- breeding engineering networks;
- monolithic work.
In Section B
- work continues on connecting to the gas network.
In Section B
- work continues on connecting to the gas network.
In Section G
- plastering work on 10-11 floors;
facade decoration; - breeding of engineering networks.
In Section D
- preparatory work is underway to move crane equipment.
In Section 4D
- brickwork of 1 floor.
On the street Nazariya Yaremchuk concluded a rough layer of asphalt.